Projects

Programmes

Selected engineering programmes

Representative engagements across turbine engines, aircraft systems, maintenance supervision and regulatory documentation. Client identities are anonymised. Detailed case material is available under NDA.

8+Case studies
3Core mandates
DE & EUProgramme reach
Turbofan Shop Visit Supervision
2024 Northern Germany
Turbine Engines

Turbofan Shop Visit Supervision

European airline MRO partner

On-site supervision of a commercial turbofan shop visit: work-pack control, hot-section findings disposition, and return-to-service technical records for the operator.

Scope

  • Daily hangar leadership across strip, inspect and rebuild phases
  • Repair scheme review against OEM manuals and approved data
  • Engine logbook and CRS readiness pack for the customer CAMO

Key Deliverables

  • Supervised work-pack close-out
  • Disposition register
  • Handback technical file
TurbofanPart 145Shop VisitLBA
Aircraft Systems Modification Package
2024 Germany (on-site)
Aircraft Systems

Aircraft Systems Modification Package

Business aviation operator

Build and integration of an aircraft systems modification: electrical, hydraulic interface updates and ground functional testing before return to service.

Scope

  • Installation planning and interface control for affected systems
  • Hangar build supervision with functional check procedures
  • As-built documentation for continuing airworthiness

Key Deliverables

  • Installation work instructions
  • Functional test results
  • As-built drawings pack
SystemsModificationGround TestCAMO
Engine Mount & Nacelle Integrity Review
2023 Northern Germany
Turbine Engines

Engine Mount & Nacelle Integrity Review

Regional aircraft lessor

Technical review of engine mounts and nacelle structure after hard landing: inspection planning, disposition advice and ferry-flight readiness support.

Scope

  • Damage mapping against structural repair data
  • Coordination with NDT and structural specialists
  • Clear go / no-go criteria for return to flight

Key Deliverables

  • Inspection plan
  • Disposition memo
  • Ferry readiness note
MountsNacelleNDTAirworthiness
Part 145 Procedure Alignment
2023 Hamburg, Germany
Regulatory Compliance

Part 145 Procedure Alignment

German maintenance organisation

Gap analysis and procedure updates for an EASA Part 145 organisation preparing for LBA oversight, with focus on engine and aircraft systems work scopes.

Scope

  • MOE section review against Part 145 and LuftVG expectations
  • Engine and systems capability list documentation
  • Internal audit checklist and finding closure support

Key Deliverables

  • Updated procedure drafts
  • Audit checklist library
  • Briefing pack for quality manager
Part 145LBALuftVGQuality
Engine Ground-Run Acceptance Campaign
2022 Baden-Württemberg, Germany
Propulsion Performance

Engine Ground-Run Acceptance Campaign

Engine shop / operator joint programme

Acceptance ground-run campaign after heavy maintenance: instrumentation plan, data reduction and performance sign-off for installed turbine engines.

Scope

  • Run schedule and instrumentation checklist
  • EGT, vibration and fuel-flow data reduction
  • Acceptance report for operator technical services

Key Deliverables

  • Run plan
  • Performance data pack
  • Acceptance report
Ground RunPerformanceTurbineAcceptance
Line Maintenance Technical Lead
2024 German airline station
Maintenance Supervision

Line Maintenance Technical Lead

Scheduled airline station

Technical lead for line maintenance on aircraft systems and powerplant defects: troubleshooting, component swaps and same-day return-to-service discipline.

Scope

  • Defect troubleshooting for engines and aircraft systems
  • Coordination with stores, shops and CAMO
  • Shift handover with clear open-item control

Key Deliverables

  • Defect close-out records
  • Shift technical notes
  • Repeat defect watchlist
Line MXPowerplantSystemsAOG
Additional Work

Further Programmes

Hot-Section Repair Scheme Support
2022 North Rhine-Westphalia, Germany
Components & Materials

Hot-Section Repair Scheme Support

Turbine component shop

Technical support for hot-section component repairs: scheme selection, NDT acceptance and fitness-for-service notes before engine reassembly.

Scope

  • Repair scheme comparison against OEM and approved data
  • NDT method and acceptance criteria definition
  • Reassembly readiness checklist for the engine shop

Key Deliverables

  • Scheme recommendation
  • NDT criteria sheet
  • Fitness note
Hot SectionRepairNDTEngine Shop
APU & Secondary Systems Overhaul
2021 Switzerland / Germany
Aircraft Systems

APU & Secondary Systems Overhaul

Business jet MRO

Supervision of APU removal, shop visit and aircraft systems reintegration, including bleed and electrical interface checks on return to service.

Scope

  • Removal and installation work-pack control
  • Bleed air and electrical functional tests
  • Technical records for aircraft and APU logbooks

Key Deliverables

  • Work-pack close-out
  • Functional test log
  • Logbook entries pack
APUSystemsMROFunctional Test
Visual Archive

Programme Imagery

Atmosphere from recent turbine, systems and hangar programmes.

Start a technical discussion

Support for operators, maintenance organisations and engineering teams that need disciplined leadership on the hangar floor and in the documentation pack.

Contact Teresio Engineering